Archispace

Prefab Modular Construction Camp Solution

Changshu yahgee Modular Building Co., Ltd. is located in Changshu High-tech Industrial Development Zone, Suzhou City, Jiangsu Province. It was established in 2011. The company has been committed to the development and operation of new integrated buildings and special containers. It has packing boxes, special containers, modular buildings, etc. A series of products, the products have been successfully sold to Asia, Australia, Europe, North America, Southeast Asia, the Middle East, Africa, South America, Japan, Hong Kong, Singapore and other countries and regions.

The company’s registered capital is 340 million yuan, and the factory covers an area of ​​166,500m², of which the steel structure workshop has a construction area of ​​43,800m², the interior decoration workshop has a construction area of ​​17,000m², and the production line is 1,800m long. The annual production capacity can meet the requirements of 3,000 boxes of modular buildings, 3,000 boxes of special containers, and 18,000 boxes of packing boxes at the same time. Over the years, Yahgee has actively undertaken social responsibilities and has the courage to undertake corporate missions, and has successfully completed tasks in national and local governments’ anti-epidemic and earthquake relief efforts for many times. In the future, it will play an active role in the process of upgrading from a manufacturing power to a manufacturing power. Yahgee will be brave in innovation, self-improvement, forge ahead, and shoulder heavy burdens. Efficient” corporate culture construction!

In 2001, Yahgee established; In 2003, Nanshan Group took over Yahgee; In 2005, Yahgee shareholding reformed; In 2006, Set up regional branches to cover up south, north, east & southwest of China; In 2008, Yahgee’s operating revenue exceeded 2 billion RMB; In 2009, Yahgee successfully listed on Shenzhen Stock Exchange; In 2010, New branches set up for northeast, northwest areas to complete the state coverage; In 2011, 43 acres Changshu manfacturing base of high-end products established; In 2015, Join hands with Nanshan Real Estate & recombine to Shenzhen New Nanshan Holding Group; In 2016, Yahgee Prefabricated Building Design Institute established.

As the leader of container industry, it has perfect equipment and advanced production line:

EQUIPMENTS: Multiple Position Pressing Equipment: This equipment through the pre-written program to automate the operation, not only to save time and labor, but also to maximize the guarantee of accuracy, easy to assemble the box;

Sheet and Tubes sanding(Steel surface process equipment):After the sanding process of the steel surface , can remove the rust and scale of steel surface . At the same time, the formation of small pits on the surface of steel, painting primer can ensure the adhesion of paint, improve the corrosion resistance of the product;

Watertight Test Room:After finish the container, we still have one important step need to do——watertight test. Find out the drawbacks of welding or fit-up then adjust the drawbacks in time(such as leaking) to avoid rise dissatisfaction from client;

Laboratory:Our laboratory simulate different transportation environment and carry out mechanical test for the steel structure of modules of different sizes.

The production line:Flexible Sub-assembly Welding Line:Fast production line changing, different product will have jig to ensure the accurate production;

Flexible General-assembly Welding Line: Quality and production efficiency can both be ensured during the flexible Sub & General assembly line;

Second shot blasting and Coating line: After the surface of those steel plate and material which is sanded and painted, it may have some problems. In the follow-up produce , the high temperature surrounding the welding area will lead to the oxidation of steel surface, forming loose oxide skin, the second time sanding is shot blasting of the welding area, remove these oxide skin, in order to maintain the quality of follow-up painting construction. Multi-layer paint coating and timely drying, improve the overall rust resistance : Each layer of painting needs time to be dried . Every painting room is equipped with a drying room to ensure the drying degree of each paint is in accordance with the technical requirements , make it easy access to the next paint construction, and thus maintain a certain production efficiency under the premise of ensuring paint construction quality. After the above steps, the painting quality warranty can reach at least 3-5 years . Otherwise, after half a year will come out the rust if do the simple painting procedure.

In the development process of Changshu Yazhi, it pays great attention to innovation and technology. It has passed the qualification certification of “National High-tech Enterprise” and “Jiangsu Modular Construction Engineering Technology Research Center”, and has accumulated 79 authorized patents. It has cooperated with many domestic and foreign companies, Universities and research institutes establish long-term cooperative relations. Passed ISO9001, ISO14001 and ISO45001 (quality, environment and occupational health and safety) management systems, obtained many factory certifications and product certifications, including Japan R grade steel structure certification, steel structure modular building CSA certification, Singapore PPVC-MAS certification, New Zealand Multi-pod certification, Norway Tek 10 certification, etc.