Modular Offices and Camps

For Construction Site Office Staff

The project consists of five floors, including business, leisure, and catering.

1) Self-built water circulation system. After the rainwater is collected, it can be used as green irrigation water or domestic water after treatment.
2) The project camp uses permeable bricks, and there is no standing water on the ground.
3) In the project area, street lighting is powered by solar energy.

Quantity: 116 packing boxes (dormitory area: 48, office 1 area: 48, office 2 area: 20)

User: Project Management Staff